The Arizona Department of Transportation has initiated a pavement rehabilitation project on Interstate 17 between Sunset Point and the State Route 69 interchange (mileposts 252-262).
The Arizona Department of Transportation has initiated a pavement project to replace the worn pavement surface along I-40 between Markham Wash to Seligman TI in Yavapai County (mileposts 108-123).
In July 2024 the Arizona Department of Transportation started construction on a new system-to-system traffic interchange that will create a free flowing connection between Interstate 40 and US 93 in west Kingman. Construction is expected to be completed in approximately 2.5 years, through early 2027.
The Arizona Department of Transportation, in coordination with the city of Kingman and the Federal Highway Administration, is constructing the new Rancho Santa Fe Traffic Interchange on Interstate 40 (Exit 57) in east Kingman.
Construction started in December 2024 and is scheduled to be completed in mid- 2026.
The Arizona Department of Transportation has started a project that will include removing and replacing the pavement along an 11-mile section of Interstate 40 through the city of Kingman. The project area is located between Holy Moses Wash and Rattlesnake Wash (mileposts 47-58).
The Arizona Department of Transportation has initiated a pavement preservation project along an 8 mile section of eastbound Interstate 40, east of the City of Kingman. The project area is located between the I-40/US 93 traffic junction and Silver Springs Road (mileposts 72–80).
The Arizona Department of Transportation has initiated a safety project on State Route 69 in Prescott (milepost 293). The work consists of constructing a new raised center median and widening the southbound outside lane along SR 69.
The Arizona Department of Transportation has initiated a bridge project to replace the Santa Maria River Bridge on State Route 96 in Apron Crossing, approximately 11 miles east of the Town of Bagdad in Yavapai County (approximate milepost:11).
The Arizona Department of Transportation has initiated a pavement rehabilitation project on US Route 60 between Wickenburg and Morristown (mileposts 110-121). The work consists of removing and replacing the pavement, installing pavement markings and other related work.