Guidelines
Infrastructure Delivery and Operations Division
This list is provided as a centralized resource for ADOT guidelines as of August 2015.
Bridge Group
Construction and Materials
- ADOT Construction Manual
- ADOT Materials Policy and Procedure Directives Manual
- ADOT Preliminary Engineering and Design Manual
- ADOT Process Improvement Review Report Construction Manager at Risk (CMAR)
- ADOT WZS&M Implementation Guidelines
- Construction Bulletins
- Construction Manager at Risk (CMAR) Process Guide
- Consultant Construction Administration Manual
- Design-Build Procurement and Administration Guide
- Geotechnical Design Policies and Reports
- Radiation Safety Program
- Tucson District Freeway Closures
- Value Analysis Program Guidelines
- Value Analysis Program Team Member Preparation Guide
- Value Analysis Program Project Manager's Guide
- Valley Transportation Group Freeway Closures
Engineer in Training and Intern Programs
Engineering Consultants Section (ECS)
Engineering Survey
Environmental Planning Group (EPG)
- ADOT Methodology for Determining Final Stabilization
- Clean Water Act Section 404/401 Guidance Manual
- Consultant Biological Procedures
- Current Noise Abatement Policy
- Erosion and Pollution Control Manual
- Post-Construction Best Management Practices (BMP) Manual
- Maintenance and Facilities Best Management Practices (BMP) Manual
- Winter Storm Management Operations Manual
ITS/Systems Technology Group
Maintenance Management Services
Partnering
Product Evaluation Program
Project Management Services
Record Drawings
Right of Way Procedure Manuals
Roadway Engineering
- 2 Ft. Offset Distance to Roadside Barriers
- 2015 Drafting Guides
- Crash Cushion Selection Procedure
- Climbing and Passing Lane Policy
- Design Exception and Design Variance Process Guide
- FHWA Interstate System Access
- FHWA - New or Revised Access Points on the Interstate System (Change of Access Requests)
- Guidelines for Highways on BLM and USFS Lands
- Guidelines for Scoping Pavement Preservation Projects
- Project Assessment Procedure
- Pipe Selection Guidelines and Procedures
- Project Assessments and Design Concepts
- Project Scoping
- Roadway Design Guidelines
- Roadway Design Memorandum Turnout Paving in PM10 Non-Attainment Areas
- Roadway Drainage Guidance:
- Use of Portland Cement Concrete Pavement (PCCP) at Traffic Interchange (TI) Intersections
Traffic Group
Utility and Railroad Engineering