Northwest District Projects

Northwest District Projects

Map showing the SR 95 raised median project from S Palo Verde Road to Industrial Boulevard and from N Palo Verde Road to Price Road

Project Cost: $2,825,500 million 

The Arizona Department of Transportation will begin a highway safety improvement project this summer to install more than 2 miles of raised center median along State Route 95 in north Lake Havasu City.
Project Map - US 60 Centennial Wash Bridge Replacement

Project Cost: $13,707,564.30

The Arizona Department of Transportation has initiated a project to remove and replace an existing bridge on US 60 with a new seven-span bridge in the community of Wenden (milepost 62).

Map US 93 Cane Springs Improvement Project

Project Cost: $48,750,981.10

The Arizona Department of Transportation will begin construction in January 2025 on the US 93 Cane Springs Improvement project north of Wikieup.
US 93 CORRIDOR Interstate 40 to Wickenburg Improvements UPDATED WINTER 2024
ADOT has dedicated nearly half a billion dollars to widening and improving US 93 from Wickenburg to Hoover Dam over the last several years. ADOT's long-term vision is to transform this highly traveled route into a four-lane divided highway through the entire 200-mile stretch. The US 93 series of projects is a priority for ADOT and has significantly improved our state highway system to move people, goods and services more efficiently.
US 93 Old Wikieup-Hillside to North of Nothing Project Map
Project Cost: $22,414,689 The Arizona Department of Transportation will begin a construction project this spring to replace the riding surface along a 13-mile section of US 93 south of Wikieup in Mohave County (mileposts 131-144).
us-93-vista-royale-widening-map

US 93, one of Arizona’s Key Commerce Corridors, is the main route connecting Phoenix and Las Vegas, two of the fastest-growing metropolitan areas in the country. The Arizona Department of Transportation (ADOT) has been systematically improving US 93 between Phoenix and Las Vegas for over 20 years. While US 93 from I-40 (Kingman) to the Nevada state line has been fully improved to a four-lane divided highway, a handful of narrow, two-lane sections remain.

US 93: MP 172- Moore Ranch Road project map

Project Cost: $25,732,000

The Arizona Department of Transportation has initiated a pavement rehabilitation project on US 93 approximately 15 miles northwest of Wickenburg (mileposts 172-185). The work consists of removing and replacing the existing pavement. Additional work includes replacing guardrails and end terminals, repairing a bridge deck, replacing pavement markings and other miscellaneous work.

us-93-tegner-street-wickenburg-ranch-way-map

Project Cost: $55,000,000

The Arizona Department of Transportation initiated and completed a construction project to widen and improve a 5-mile segment of US 93 between Tegner Street and Wickenburg Ranch Way (mileposts 194 - 199) in Wickenburg.