us-93-kabba-bridge-photo

This project is complete

The Arizona Department of Transportation is working on a bridge rehabilitation project at the US 93 Kabba Wash Bridge north of Wikieup in Mohave County.

Map US 93 Pavement Project: Gunsite Canyon Road to Gray Wash

This project is complete

Project Cost: $4.3 million

The Arizona Department of Transportation has completed a construction project to remove and replace the top riding surface along a 10-mile section of US 93. The pavement project was located between Gunsite Canyon Road and Gray Wash in the community of Wikieup (mileposts 120 to 130).

Map US 93 Legend Ranch Road to Date Creek Road

Project Cost: $1.3 million

The Arizona Department of Transportation is initiating a construction project to repair three segments of pavement on US 93 in Mohave and Yavapai counties.

US 93 Sycamore Creek Map

This project is complete

The Arizona Department of Transportation has completed a project to make improvements to the Sycamore Creek and Gray Wash bridges on northbound US 93 (mileposts 128-129) south of Wikieup.

us-93-vista-royale-widening-map

US 93, one of Arizona’s Key Commerce Corridors, is the main route connecting Phoenix and Las Vegas, two of the fastest-growing metropolitan areas in the country. The Arizona Department of Transportation (ADOT) has been systematically improving US 93 between Phoenix and Las Vegas for over 20 years. While US 93 from I-40 (Kingman) to the Nevada state line has been fully improved to a four-lane divided highway, a handful of narrow, two-lane sections remain.

us-93-installation-of-rumble-strips-map

The Arizona Department of Transportation is planning to install centerline rumble strips on US 93 approximately 38 miles northwest of Wickenburg (between mileposts 161-183).

US93-Moore-Ranch-Rd-Improvement-Project-map
Currently not paving due to night weather and temperatures.

The project will resume in spring/summer 2024 and is scheduled to be completed in late summer/early fall 2024.

The Arizona Department of Transportation is beginning work to remove and replace the existing top layer of pavement along US 93 between Moore Ranch Road and milepost 190 (mileposts 184-190) north of Wickenburg. The purpose of the project is to improve the condition of the pavement and extend its service life.

US 93: Pavement Preservation between Nothing and State Route 97 Map

Project Cost: $18.7 million

The Arizona Department of Transportation is initiating a pavement project this spring along a 12-mile section of US 93, roughly between the community of Nothing and State Route 97 (mileposts 144 to 156).

us-93-tegner-street-wickenburg-ranch-way-map

Project Cost: $50,966,991

The Arizona Department of Transportation has initiated a construction project to widen and improve a 5-mile segment of US 93 between Tegner Street and Wickenburg Ranch Way (mileposts 194 - 199) in Wickenburg.